Key Fetures:
Specification:
Series No. |
GSHY- 300W |
GSHY- 500W |
GSHY- 1000W |
GSHY- 2000W |
GSHY- 3000W |
GSHY- 4000W |
GSHY- 5000W |
|
Power Output |
DC output |
12V 5W Interface, 5V/0.5AUSB |
||||||
Rated Power(AC) |
300w |
500w |
1000w |
2000w |
3000w |
4000w |
5000w |
|
Peak power(AC) |
600w |
1000w |
2000w |
4000w |
6000w |
8000w |
10000w |
|
Voltage/ Frequency |
100V/110V/120V/200V/220V/240V (±5%), Pure Sine Wave 50Hz/60Hz (±0.5Hz), Single phase |
|||||||
Power Input |
Battery voltage |
24V |
24V |
48V |
48V |
48V |
48V |
48V |
Grid voltage /Frequency |
100V/110V/120V/200V/220V/240V 50Hz/60Hz (±0.5Hz), Single phase |
|||||||
Component and Specification |
||||||||
Poly Solar Panel (standard) |
155w/18v |
310w/36v |
310w/36v |
310w/36v |
310w/36v |
310w/36v |
310w/36v |
|
4pcs |
4pcs |
8pcs |
16pcs |
24pcs |
28pcs |
32pcs |
||
Battery(GEL) 12V (optional) |
100Ah |
200Ah |
200Ah |
200Ah |
200Ah |
200Ah |
200Ah |
|
2pcs |
2pcs |
4pcs |
8pcs |
12pcs |
16pcs |
20pcs |
||
Combiner box(standard) (IN/OUT) |
No |
4/1 |
4/1 |
8/1 |
12/1 |
14/1 |
16/1 |
|
AC charger(optional) |
1pc |
1pc |
1pc |
1pc |
1pc |
1pc |
1pc |
|
Bracket(optional) |
1set |
1set |
1set |
1set |
1set |
1set |
1set |
|
DC switcher(optional) |
2pc |
2pc |
2pc |
3pc |
4pc |
5pc |
6pc |
|
AC switcher(optional) |
1pc |
1pc |
1pc |
1pc |
1pc |
1pc |
1pc |
|
Function /Working Conditions |
||||||||
Display |
LCD , statue of system |
|||||||
Protection |
Overload, battery over/under voltage, over current, over/under voltage recovery |
|||||||
High temperature, short circuit, Reverse connection |
||||||||
Communication |
RS232 |
|||||||
Cooling |
Fan |
|||||||
Working temperature |
-30℃ ~55℃ |
|||||||
Warranty |
1year |
Connection Step:
1) Before installation and debugging to prepare the corresponding installation tools and measuring tools,
such as cross screw driver, diagonal cutting pliers, multi meter, etc.
2) Check whether the required parts is complete(wiring, accessory bag and user manual, etc.) or not,
PV panels’ and battery’s voltage match the inverter type,Batterycapacity must be able to provide enough
load current.
3) Before use ,the inverter’s ground(GND) must connected the earth, and can not be used to the zero line
of local Electric line.
4) Ensure that all the power switcher in OFF .
5) Confirm the positive and negative polarity of battery, high potential for positive(B+),low potential
Negative(B-).
6) Confirm the positive and negative polarity of PV panels, high potential for positive(S+), low potential
Negative(S-).
7) The input terminals of inverter with screwdriver respective unscrewing.
8) Choose an appropriate cross sectional area of the red wire one end(see table 1)connect the battery,
the other Side to connect Air-switcher(circuit breaker)(see table 2)input terminals, The air switch
(circuit breaker)’s output Terminal connect the inverter input terminals, The positive terminal B(+)
and by cross screw driver to tighten. To complete the positive terminal connection of the battery
( The steps ①as shown in figure 1).
9) Choose an appropriate cross sectional area of the black wire one end(see table 1) connect the
battery, the other Side to connect Air-switcher(circuit breaker)(see table 2)input terminals, the
air-switch(circuit breaker)’s output Terminal connect the inverter input terminals the positive
terminal(B-) and by cross screwdriver to tighten, to Complete the negative terminal connection of
the battery(the steps②as shown in figure 1).
|
Download:Solar and Grid Hybrid System